The job is awarded. Who is going to deliver it?

MXLV puts senior fire alarm and electronic security delivery — design, project management, and recovery — on jobs your team cannot staff. One side of the project. No hardware. No installation.

The layer between award and acceptance.

78%

of integrators say talent is their biggest challenge in 2026 — ahead of tariffs, supply chain, and inflation.

Commercial Integrator, 2026 State of the Industry

58%

of integrators report rising demand for subcontracted labor year over year.

Commercial Integrator and ADI integrator survey

Demand is not the problem. Experienced delivery is.

Permanent hiring is slow and the senior people are already spoken for. MXLV turns that gap into a project cost: a named lead on a named job, for as long as the job needs one.

Which side of the table are you on?

Integrators

You won it. Your bench is full.

White-label project management, design pods, recovery, and national-account rollouts — under your contract, invisible to your customer.

Owners & facilities

Nobody owns Division 28 on your job.

A fire and security specialist on your side from basis of design through witness test and turnover.

Electrical contractors, GCs & CMs

Fire alarm landed in your package.

Design, project management, and recovery for low-voltage scope you carry but do not want to staff.

Project recovery

Job in trouble? It starts with a 72‑hour diagnostic.

A written risk view and a plan back to closeout. No retainer required to start the diagnostic.

If any of these are true, call it now:

  • The pretest failed, or keeps slipping.
  • The AHJ rejected the submittal.
  • The PM left mid-job and nobody owns the schedule.
  • Change orders are eating the margin.
  • The occupancy date is fixed and the turnover package is not.
  • The owner or GC has stopped believing the schedule.

The one-side rule

MXLV works one side of a project. We never represent the integrator and the owner on the same job, and the conflict check runs before a proposal exists. That is why integrators can white-label us and owners can trust the review.

From brief to named lead.

Conflict check first. When there is no conflict and there is capacity, the target is a named lead within 48 hours — a target, not a guarantee.

  1. Step 1

    Engagement brief

    A reference number, and the conflict check starts.

  2. Step 2

    Conflict and fit check

    A yes, a no, or a disclosed conflict — before any proposal.

  3. Step 3

    Diagnostic

    A written risk view.

  4. Step 4

    Commercial model

    A commercial model matched to the job.

  5. Step 5

    Named lead

    A named lead and a weekly status you can read in four minutes.

Where fire and security sit on the critical path

If the award landed and the bench is already full, that is the engagement.

Four minutes to brief MXLV. Conflict check before a proposal. A named lead if the fit is real.